ZARKAAR Group · EstatesDiscuss a project
Close detail of limestone, brick, and a brass joint

Home Services

Services in the building

Water, power, and a drain that works.

The pipes, the wires, and the falls inside the building we are constructing. They are planned before the slab, and finished with the rooms.

Inside the building

Cold and hot water, the baths, the kitchen, the underground or overhead tank the drawing shows, and the drains with a fall that actually leaves the plot. Electrical points where the furniture will be, not where the conduit happened to end.

These are part of a house or a commercial building we are already building. They are discussed with the structure, because the sleeves go in before the concrete.

What this page is not

This desk does not sell solar plants, and it does not run an electrical store. Agriculture remains on zarkaaragri.com. If your question is a panel on the roof as its own product, that is a different conversation, and it is not this form.

Connection to the society’s lines and to the utility follows their process. We leave the building ready for that connection. We do not pretend to be the utility.

Drawn with the rooms

The kitchen hob, the baths, the laundry, and the prayer wash if you asked for one each need a point and a drain. Furniture and switches are on the same plan, so a wardrobe does not bury the only board.

Hot water, if you want it, is a point on the drawing. It is not a geyser balanced on finished tile with a pipe across the window.

Up to the boundary

We build to the connection the society or the utility names. The application is usually yours. We do not promise their date. The utility guide says this without the room-by-room detail.

Yard manholes and the line across the plot are the yard-drains page. Tanks are the tank page. This page is the installation in the building.

  • Inside Pipes, wires, falls
  • Before the slab Sleeves and routes
  • Not this desk A solar plant or a bore

Can you rewire a house you did not build?

As a renovation, after we see the routes and the board. A new point chased through a finished wall is written down, including the making-good.

Do you supply a generator?

No. If you will keep one, the plant-space page is the room, the pad, and the exhaust path. The machine is yours.

Will the drains share a hole with the rain?

Not by carelessness. Roof water and sewage have separate routes. A porch that slopes into the front door is a fault even when the kitchen pipes are perfect.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.