ZARKAAR Group · EstatesDiscuss a project
A brick and concrete house frame under construction at golden hour

Home Services

The going

The stair is walked every day, so it is drawn that way.

Width, rise, and a landing where a person can turn. A stair copied from a narrower house becomes the thing the family apologises for.

The line

The stair starts where the plan can afford the width, not in the leftover corner after the rooms have taken the plot. Headroom is checked on the section. A beam across the line at forehead height is a drawing error, and we treat it as one.

If the roof will be used, or a mumty is in the brief, the stair continues. A ladder added later is not a stair, and it is not how a tank is safely reached.

Structure

Concrete stairs rise with the floors they serve. The steel is seen before the pour, the same way a slab is seen. The frame page is that habit. This page is the walk itself.

A steel or timber stair in a finished well is possible when the well was left for it. We do not cut a well through a slab that has rooms under it without a drawing that says how the slab still stands.

The finish underfoot

Polished stone at the entry looks calm and is unforgiving when someone comes in from rain. The nosing and the surface are a sample. We talk about wet shoes before the stone is ordered.

A handrail is part of the stair. The height and the fixings are on the sheet, including the landing, not only the straight flight in the photograph.

Light and the well

A dark stair is a stair people dislike. A window, a roof light, or a deliberate lamp is in the brief. We do not leave the well as a shaft and call it architecture.

The underside of the stair is a room, a store, or nothing. If it is a store, the door and the headroom are drawn. If it is nothing, it is still finished, because guests see it.

  • Drawn Before the slab closes
  • Used by The people who live here
  • Continues To the roof, if the roof is used

Can the stair reach the roof?

Yes, when the roof is meant to be used or maintained. Say so before the top slab is poured. A later opening is a structural change.

Do you build a marble stair because a magazine had one?

The material can be marble if you approve that sample, including how it behaves when wet. The going and the width still follow this house, not the photograph.

Is a stair part of grey structure?

The concrete flight is. The finish, the rail, and the light are later. You can stop at the flight and finish it in a second scope. Say which one you want.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.