ZARKAAR Group · EstatesDiscuss a project
A shaded residential lane with lawns, trees, and plaster houses

Home Services

Existing buildings

Change a building that is already there.

An added floor, a new kitchen, a rebuilt bath, a tired front. Renovation starts with a visit, because the walls know things the brief does not.

What we will look at first

Who owns the plot, what the society allows on that file, and whether the structure can carry what you want to add. An extra floor is a structural question before it is a design question.

We open the rooms you want changed. Damp, levels, old wiring, and a roof that already leaks are part of the brief. Hiding them makes a second job.

Lived-in streets

DHA and Dream Garden are occupied communities. A renovation has neighbours, a gate, and hours. We agree access and the noisy work before we start.

If the honest answer is that the building should not take the load you want, we will say that. A new building is a different page.

A written extent

What is opened, what is kept, and what is new. A crew that is already dusty will keep going unless the limit is plain. Salvage is a list, or it is rubble.

Before a wall comes out, the demolition guide applies: structure, live services, and the neighbour on the other side.

An occupied house

If the family is still sleeping there, the phases are part of the brief. One bath works. There is a way to cook. Valuables move before we open a wall.

Society hours still hold. A gated street does not become a night shift because the family is impatient.

A single room is still a scope

One bathroom, one kitchen, or one floor can be the whole job. It still needs a written extent, a look at the structure around it, and a way for the household to live through the work.

Furnishings alone, with no building work, are not this desk. An added floor is not a renovation until the structure and the file can carry it.

  • Starts with A visit
  • Includes Kitchens, baths, fronts, added floors
  • Refuses A load the building cannot carry

Can you renovate a single bathroom?

Yes. We open the room, check the fall and the waterproofing, and agree what is replaced. The family still needs a working bath on the nights that one is open.

Will you add a floor as a renovation?

Only after the structure and the society file are shown to allow it. The added-floor page is that question. A photograph from the street is not a structural survey.

Do you take a furnishings brief with no building work?

No. Curtains alone are not a construction job. If the walls, the services, or the floor have to change, this is the right desk.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.