ZARKAAR Group · EstatesDiscuss a project
A two-storey family house in pale stone and warm brick

Home Services

The coat

Paint is the last visible layer, so the wall under it has to be ready.

Preparation, a sample you saw in daylight, and an outside face that can take sun and dust. A new coat on a damp or dusty wall is not a finish.

Preparation

Cracks are opened and filled if the wall deserves paint. A salt line is investigated, not sealed in. The plinth page is that investigation when the stain starts at the base.

Dust from sanding and from the street is cleaned off before the coat that is supposed to be the final one. Painting through an active site is how a room looks old on day one.

The sample

Colour, sheen, and the number of coats are what you saw on the board, on a wall in real light if we can arrange it. A phone swatch is a hint. The board is the standard.

A cheaper paint substituted on site is a change, even when the colour name matches. The samples guide applies here as it does to stone.

Outside

The street face takes sun, dust, and the splash at the plinth. The product on that face is chosen for that, and it is coordinated with the elevation. A smooth interior emulsion on an outside wall is a brief we will question.

Scaffold, the neighbour, and the society hours apply. External paint is not a quiet Sunday unless the rules say the hours include it.

A repaint on its own

We will repaint a sound building. If the brief is only colour and the plaster is failed, we will say the job is plaster and then paint.

Ceilings, including a false ceiling, are coordinated with lights. We do not close a ceiling and then discover a beam or a point that had to stay reachable.

Colour where the wall will live

An exterior colour is judged outside, on the face that takes the sun. The same tin looks different on a west wall and in a stair.

Paint waits until the dust of the earlier trades has a reason to leave. Painting a room that is still being cut is how a new house looks tired.

  • Inside After the dust of earlier trades
  • Outside Sun, dust, and washing
  • Standard The board you approved

Will you name a rate per square foot for paint?

No. Preparation, height, the product, and whether the building is occupied change the job. We price a written list of surfaces.

Can you paint while the family is living there?

Yes, in phases. Furniture, a working room, and dust control are part of the brief. The guide on living through the work applies.

Do you choose the colour?

We can propose a board. You approve it. The building receives that board, not a near match from an open tin.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.