Finish the building that is already standing.

Plaster, floors, joinery, paint, and the fittings you chose. Finishing starts when the frame is sound, not before.

A finish is a list, not a mood

We write down the floor in each room, the plaster, the doors, the windows, the kitchen, the baths, and the paint. A sample is easier to agree than a word like “premium”.

If the grey structure was built by someone else, we look at it before we price the finish. Cracks, levels, and missing sleeves change the job. We will say so.

Multan use

Floors and external plaster have to live with dust, sun, and a hard summer. We talk about that when the samples are on the table, not after the first hot month.

The fittings are the ones in the brief. A substitution on site needs you, not a quiet swap.

The order inside a finish

Wet rooms are waterproofed before tile. Wood waits until the room is dry. Paint waits until the dust of the earlier trades has had a chance to leave. A kitchen fitted into a workshop looks tired on the first day.

Each room has a sentence in the list: floor, walls, ceiling, door, and the fittings. One word for the whole house is how the wrong stone arrives.

A finish on a frame someone else built

We look before we price. Levels, cracks, a roof that ponds, and sleeves that were never left become part of the new brief. The guide for a frame someone else started is the longer version.

We do not inherit their price or their date. A beautiful tile on a wet slab is a short-lived beautiful tile.

A list you can point at

The finish list names the room and the item. A verbal standard becomes three different floors. The sample, the brand, and the room sit on the same line before anyone orders.

Come when the plaster is up and again when the floors are down. A comment while the room is open is cheaper than the same comment on handover day.

  • Starts When the frame is sound
  • Held to A written list and samples
  • Includes Plaster, floors, joinery, paint, fittings

Can you finish only the bathrooms and the kitchen?

Yes. Name the rooms. The rest of the house can wait, provided the services those rooms need are already in the walls or are part of this scope.

Who chooses the fittings?

You do, against a sample. A quieter item from the shop on the day is a change, not a kindness.

Will you finish a house while the family is living in it?

Yes, in phases. One working bath and a way to cook stay available. The guide on living in the house is that sequence.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.