ZARKAAR Group · EstatesDiscuss a project
A brick and concrete house frame under construction at golden hour

Home How we work

03

The ground is checked before it is trusted.

Lines, levels, and the soil the foundation has to sit in. This is the stage that is invisible later, which is why it is watched.

Setting out

The building has to land on the plot you own, inside the setbacks the society requires, with the gate on the side the plan chose. We set that out and look at it before excavation becomes a habit.

A plot that is not square still gets a square building, or a deliberate response. It does not get a hope.

Foundations

Depth and reinforcement follow the drawing and what the excavation actually shows. If the ground disagrees with the assumption, the drawing is revisited. We do not hide a surprise under a blinding layer and carry on.

Neighbours and the street are already in the guides. They apply from this day, not from the day of the plaster.

Pegs before the hole becomes a habit

The building is set out on the plot and looked at before excavation settles in. A plot that is not square still gets a deliberate plan. Skewed rooms are not an accident we discover at the plaster.

The gate side, the neighbour side, and the setback are visible now. If a line on the sheet and a peg on the ground disagree, we stop. Sorting it out later means a wall in the wrong place.

What the hole is allowed to show

Depth follows the drawing. If the soil is not the soil the drawing assumed, we do not hide the difference under a blinding layer. The drawing is revisited. This website does not publish a bearing capacity, because your plot is not a number we can invent from the road.

Water in the hole, fill, and a neighbour foundation are reported. They are why this stage is watched. Curing and the frame come after the foundation is the one the drawing settled on.

  • Checked Lines, levels, and the soil
  • Setbacks From the current sheet
  • A surprise The drawing is revisited

Do you test the soil?

Where the drawing or the ground calls for a check, the assumption is tested before we trust it. We do not invent a result, and we do not skip the look because a neighbour has already built.

Can the boundary be set out in the same visit?

Yes, when the boundary is in the scope. The wall still needs its own footing and the line the sheet allows.

Who has to be there?

Someone who can read the drawing against the pegs. A crew with a photocopy and no one responsible for the check is not the stage.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.