The finish follows the samples, room by room.

Plaster, floors, woodwork, paint, and fittings. The building starts to look like the one you approved, because the earlier stages were allowed to finish.

Order inside the finish

Wet work before wood. Floors protected once they are down. Paint after the dust of the earlier trades has had a chance to leave. A kitchen installed into a room that is still a workshop will look tired on day one.

Each sample you agreed is the standard for that item. The person fitting it should be able to point at the sample.

Your visits

Come when the plaster is up, and again when the floors are down, not only at the end. A comment at the end is still welcome. A comment while the room is open is cheaper.

The finishing service page is the same work described as a scope. This page is the same work described as a stage.

A room that is finished stays finished

A floor that is down is protected. Joinery that is fixed is not a bench for the next trade. Bathrooms are waterproofed before they are tiled, and the test is part of the stage. A kitchen is installed into a room that is no longer a workshop.

Paint comes after the dust has had a reason to leave. Paint over a live site is how a new room looks tired on the first day.

Partial work, and a frame we did not build

A finish on a frame someone else built does not inherit their price or their date. We look at that frame first. If it is not straight enough to finish, the finish waits on that fact.

An occupied house is phased. Fittings are the ones in the sample. A substitution is a question, asked before the box is opened, not a surprise at the walk-through.

  • Order Wet work, then wood, then paint
  • Standard The sample you agreed
  • A useful visit While the room is still open

Can the tiles be chosen after the plaster?

Yes. The programme should know they are not chosen yet. A room does not receive a near match because the agreed tile was still at the shop.

Do you paint before the woodwork?

Wet work, then wood, then paint, with protection between them. Reversing that order marks the samples you spent time agreeing.

Is the snag list this stage?

The snag list is the last walk. This stage is the work. A comment is cheaper while the room is open.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.