ZARKAAR Group · EstatesDiscuss a project
Close detail of limestone, brick, and a brass joint

Home How we work

02

Draw it, then argue, then build.

Plans and a structure you can point at. Changes are cheap on paper. They are not cheap in concrete.

The sheets

Floors, section, elevation, and the structural notes the site will follow. The gate and the cars are on the ground-floor plan, not in a footnote. Services that pass through a slab are drawn before the slab exists.

You approve the drawing you want built. If the society must stamp it, their stamp is the next gate. We do not pour against an unapproved sheet and call the approval a formality.

Holding the line

A site change is written. “While you are here, add a room” is how columns end up in the wrong place. The supervisor’s job is to build the sheet, and to stop when the sheet no longer matches the work.

Read the drawings guide if you are bringing sheets from somewhere else.

Lines that are miserable to add later

Drains, sleeves, the tank, the swing of the gate, and the points that cannot be fished through a finished slab. We would rather argue about those lines on paper than with a chisel. Levels belong on the section: the gate, the porch, and a floor that has to meet an older street.

Those levels are drawn. They are not left for the mason to invent on the day the concrete arrives. If the road and the plot disagree, the street-level guide is the longer note.

Which copy is current

One set is the set people build from. A revised sheet is marked so a crew cannot follow the old one by habit. Where the society stamped the work, the supervisor holds that set, plus any written change their approval still has to see.

Walk the drawing before you walk the excavation. Point at the rooms. A missing room is still cheap at this stage.

  • Sheets Floors, section, front, structure
  • On site The approved set
  • A change Written before the work moves

How many revisions are included?

The agreement says how the drawing is produced and how a change is treated. This page does not invent a count. A change on paper is still cheaper than a change in a slab.

Can the site improve the plan on the day?

It can propose a change. The proposal is written, and the sheet moves, before the work does. A conversation beside the mixer is not a revision.

Do you issue the society approval yourselves?

No. We prepare the sheets. The society stamps them or sends them back. Their approval is not ours to give.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.