ZARKAAR Group · EstatesDiscuss a project
A wide residential avenue lined with palms and boundary walls

Home Guides

Papers

Build on a plot you can show is yours.

We need to know who holds the plot, where the lines are, and whether a drawing has already been stamped. Bring the paper, not a recollection.

What helps on the table

The allotment or transfer in the name of the person who is instructing us, or a clear authority from that person. The plot number and the sector or block as the society writes them. A location sketch or a photograph of the front.

If a drawing has already been approved, bring it. Building a second plan in ignorance of the first one wastes a month.

What we do not replace

We are not the society’s transfer office. We do not “arrange a file”, and we do not buy or sell plots. If the name on the paper is not the name instructing the build, sort that before concrete.

A commercial file and a residential file are not interchangeable. The page for society rules explains why we ask.

The paper and the pegs

The file and the ground are supposed to describe the same plot. If the frontage on the paper and the frontage on the street disagree, we reconcile them before the building line is locked. A marla count that has drifted in conversation is checked against the file.

Photographs of the front help. They do not replace the plot number. A sketch that uses the society names for the roads is more useful than a pin on the wrong block.

Who is allowed to instruct

If one person holds the file and another runs the site, we need that authority in a form we can keep. We will not take a slab instruction from a relative who cannot be reached, and then learn that the holder wanted a different plan.

A commercial file and a residential file are read for use, coverage, and the floors they allow. We do not convert one into the other on the drawing to see what an inspector might say.

  • Bring The paper, not a memory
  • Not our role Transfer, sale, or allotment
  • Before concrete The name has to match

What if the transfer is still in process?

Tell us. We can talk. We do not open the ground until the person instructing the build can show the right to do it.

Will you collect the file from the society?

No. The transfer office is theirs. We read the papers you bring. We do not arrange a file, and we do not buy or sell plots.

Is a photograph of the allotment enough?

It is enough to start. Before concrete, we want the paper itself, readable, with the plot number and the name.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.