A building takes the time its stages take.

Drawing, the society’s stamp where it is required, the ground, the frame, the finish, the walk-through. We will put dates against a real scope. We will not print a fantasy schedule here.

The order

Nothing useful is excavated before the drawing and the right to build are clear. Concrete waits on steel that has been checked. Plaster waits on a frame that is straight. Floors wait on plaster. The keys wait on a list you have walked.

Rain, a late approval, and a finish that takes eight weeks to arrive are real. They belong in the programme, not in a surprise.

What we will put in writing

Once the scope is agreed, the stages can take dates. Those dates are for that job. They are not a promise this page can make to a plot we have not seen.

If you need a house by a wedding or a shop by a season, say the date at the beginning. We will tell you whether the stages can meet it.

What actually uses the calendar

Approval, when a stamp is required. Curing, which is not a gap we fill with the next pour. A sample that then takes weeks to arrive. Rain on an open excavation. A change after the slab. Each one is ordinary. None of them is solved by a slogan.

Inside the finish, waterproofing comes before the bath is tiled, wood comes after the wet work, and paint comes after the dust. Compressing that order to hit a date produces a building that looks finished and is not.

A date you already know

A wedding, a school term, the day a shop has to open. Say it in the brief. We will tell you whether the stages can meet it, or which part of the scope would have to wait. We will not promise the date and discover the drawing in the second month.

This page will not print a week-count. A plot we have not seen does not have a duration. Once a scope is signed, the stages of that job can take dates.

  • Order Drawing, ground, frame, finish
  • A date Only against a signed scope
  • Weather Belongs in the programme

How many weeks does a house take?

We do not publish a duration. A week-count without the drawing, the curing, and the finish order is how later months are spent repairing earlier ones.

Can two stages run together?

Some can. Brick can follow a slab that has cured. Plaster does not follow a frame that is still moving. Overlap is a programme decision.

Does rain stop the site?

It stops the work rain ruins: open excavation, fresh concrete, an uncured roof. The season should already be in the programme.