The number comes after the plot and the finish.

We do not publish a rate per marla or per square foot. Two plots of the same size are not the same job.

What moves the figure

The soil and the foundation it needs. The number of floors. The frontage and whether the plot is a corner. The finish you actually choose. A boundary and a gate. Demolition, if something is already standing.

A grey structure and a turnkey house are different sums. Say which one you want before you compare a number with a cousin’s number.

How the conversation goes

We look at the file and the drawing, then we put a figure against a written scope. A figure without a scope is a guess. We would rather be slow than fictional.

Payments follow the stages in the agreement you sign, not a slogan on this website. If you need the work in another city, the cost of doing it properly is part of whether we take it.

Put the scopes side by side first

A grey structure and a finished house are different sums. Soil, the number of floors, a corner, the frontage, demolition, and the finish all move the figure. Plot size alone does not. A cousin number is useful only when the scopes match.

A boundary, a gate, a porch, and a tank are in the sum only when they are named. Leaving them out to make a number look smaller, then adding them after the columns are up, is how the argument starts.

What stays off this page

No rate per marla, no rate per square foot, and no sample total for a ten-marla house. Those numbers would be fiction for the next plot. We would rather look slow than print a figure we cannot stand behind.

Society fees and utility fees are theirs. The agreement says what the construction sum covers. A connection is usually your application. We build inside the plot up to that point, and we do not promise the utility a date.

  • Published rate None
  • A figure follows A written scope
  • Payments The stages you sign

Can you give a rough number from the marla count?

We can tell you what would have to be known before a number means anything. We will not dress a guess up as a quote.

Does a corner plot cost more?

It is a different building: more wall to the street, more elevation, a different line for the foundation. The difference sits in the scope. This page does not print a corner premium.

Do you take a percentage because the website says so?

No. Payments follow the stages in the agreement you sign. This page does not set those stages.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.

The desk

Tell us the plot, and what you want built.