You may buy the finish. Write the split before anyone orders.

Client-supplied tile, sanitary ware, or kitchens can work. They arrive on time, they match the sample, and the delay is yours if they do not. Structure is a different conversation.

Why structure stays with the job

The frame is what we stand over. Cement, steel, and the concrete they become are part of that responsibility unless a written scope says otherwise. A bargain bag from an unknown yard is not a saving we will host inside a column.

If you want an exception, it is a sentence in the agreement, with a standard, not a truck that arrives unannounced.

Finishes you supply

Tile, stone, sanitary ware, kitchen units, light fittings, and sometimes windows. They are approved as samples first. The delivery matches the sample, including the batch.

Quantity includes waste. A room that runs short is patched from a later batch, and the patch shows. Order once, properly.

Time

The programme names the day a room needs its material. A late kitchen holds the kitchen. It should not silently hold the paint of the whole house. We will sequence around a delay we were told about, and we will say when a delay has started to cost the wider job.

Storage is on you until the room is ready to receive the goods, unless we have agreed to store them. An open site is a poor warehouse. The rain guide is the reason.

If the material is wrong

We will not install a finish that fails the sample, is damaged, or cannot be warranted by the way it was made. Sending it back is your arrangement with the shop. The site is not obliged to make a wrong crate into a room.

Labour to fit your material is still our scope if the agreement says we fit it. The material cost being yours does not make the fitting informal.

  • Usual client items Finishes you care to choose
  • Usual ours The structure
  • Late delivery Holds that room

Can I buy the steel myself?

Only if the agreement says so and the steel meets the drawing. The default is that structure stays inside our scope. Raise it at the brief, not at the gate on pour day.

Who is responsible for a delay in my tiles?

You are. Tell us early. We will resequence what we can. A room that cannot be closed is not billed as if the tile had been there.

Will you recommend shops?

We can show samples and say where they came from. A recommendation is not a guarantee of that shop’s next batch. The sample still governs.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.