The drawing

The drawing is the agreement, before the ground is opened.

Plans, a section, the front, and the structure. Society approval, where it is required, is their stamp. Our job is to build what that drawing shows.

What a usable drawing contains

Every floor, the roof, the section that shows heights, and the elevation the street will see. Structure notes for foundations, columns, and slabs. Where the cars go. Where the water goes.

A rendering is not a drawing. It cannot be built, and it cannot be approved. If you only have a picture, the next step is a drawing, not excavation.

Changes

A change after the slab is a different job from a change on paper. We keep a note of what moved. The society may need to see it too, if their approval covered the old sheet.

The longer page on this is in how we work.

One set, with the services on it

You may bring an architect, or you may ask this desk to prepare the sheets. Either way, one set is the set we build. Two competing plans on the same plot are how a column lands in a bedroom.

Drains, sleeves, the tank, and the gate belong on the sheets. A plan that is silent on them becomes a slab that is cut later. Cutting cured concrete is the expensive version of a line that should have been argued on paper.

The copy on site

Where DHA or Dream Garden must stamp the sheet, the stamp comes before excavation. The supervisor holds that approved set. A revision that never went back, when their approval covered the old sheet, is not the set we build.

You should be able to point at a room on the plan and find it on the ground. If you cannot, the drawing is not finished, however convincing the picture looks.

  • A usable set Plans, section, front, structure
  • Not enough A rendering
  • A change Written, then built

Will you build from a picture I saved?

No. A picture can inform the brief. The site needs plans, a section, the front, and the structure. That work comes before excavation.

Can the plan change after the society has stamped it?

On paper, yes, and then through the society if their stamp covered the old sheet. In concrete, the change is a different job, and it is written before the work moves.

Who keeps the approved drawing?

We do, on site, as the set the supervisor builds from. A copy that lives only in a phone, with nobody responsible for it, is not the record.

Photographs show the kind of street, house, and commercial building. They are not a record of a named job, and they are not a claim that Zarkaar developed the society around them.