Moving a wall, adding a bath, widening a gate. Each one is written, priced as a change, and built only after you accept it. The original sheet stays the sheet until that happens.

Why the page exists

Good houses change a little. The harm is the unwritten change: a door widened because the mason was there, a slab sleeve forgotten until the pour was tomorrow. The supervisor’s job is to build the sheet and to stop when the sheet no longer matches the work.

You will hear about a stop. That is the method, not a delay invented to impress you.

Cheap and expensive moments

On paper, a room can move. In open brick, a window can often move. Inside a poured beam, a wish is a different structure. We will tell you which moment you are in, in plain words.

We do not keep a public price for changes. The same change is a drawing note in week one and a cut slab later. The number follows the moment.

Who may ask

The brief names the person who can approve. A relative on a visit can suggest. The suggestion becomes work when that person accepts it in writing.

If two owners disagree, the site waits. We are not the referee. The two-owners guide is the way to avoid that day.

The society

A change that alters the stamped elevation, the footprint, or the use goes back to the society if their rules say so. We do not hide it in plaster.

Internal finishes that the stamp does not control can still be changes to our agreement. The inspector is not the only person who needs to know.

Before the mixer starts

The person who may instruct a change is named in the brief. A visitor, a relative, and the two owners do not all get to move a wall on the same afternoon.

If the society stamp covered the old sheet, the change goes back to them when their rules say so. We do not hide a new room in the plaster.

  • Before concrete Still a revision
  • After concrete Often a rebuild
  • Approved by The person named in the brief

Can I tell the mason directly?

No. Tell the desk. A mason who is kind enough to oblige you can still put a pipe through a beam. The instruction has to pass the drawing.

Do small changes need the same writing?

Yes. A moved socket is small until the cabinet arrives. Writing it takes a line. Discovering it takes a day.

Will you refuse a change?

We will refuse one that the structure, the rules, or the safety of the site cannot carry. We would rather lose that instruction than build it.